Installing CO2 meter for Carbon & Blender at Filters

Installing CO2 meter for Carbon & Blender at Filters in a brewery factory Supply CO2 ...

Replace power factor capacitor

Replace power factor capacitor Supply materials including: Cabinet by Rittal, switchgear by Moeller, capacitor & ...

Chlorine dosing system for water supply plant

Chlorine dosing system for water supply plant Supply Phoenix contact’s PLC, HMI, IO, Schneider’s soft ...

Electrical control panel for cooling system extension

Electrical control panel for cooling system extension Supply, installation control panel, cable tray, cable for ...

Upgrading electrical system – Pumping Station

Installing new MSB panels to replace existing panels at pump station Supplying, installation, testing & ...

Water Leakage Detection System in server room

Supplying 2 cabinets to control water leakage detection system in TEF server room and CI server room. Supplying 2 cabinets to control system. Start-up system and testing at Omina workshop Hand-over at Omina workshop.

Water Leakage Detection System

Supplying panel for water leakage detection system in server room Liquid detection sensor/controller of Omron used in ...

QR Code Auto Reading System For Emply Can Pallet

Installing camera, supplying software for QR code reading system – empty can pallet Empty can ...

Control Panel for Cooling System

Control panel for cooling system Building Cooling system control panel for ice cream production. Supplying Siemens’s PLC ...

CO2 & CH4 Safety System

Supplying & installing control panel for control CO2 & CH4 safety system. Supplying cabinet to control CO2 & CH4 safety system. Installing cable tray. Installing sensor CO2 and CH4 around factory. Doing electrical connection for electrical cabinets and instrument. Start-up system and testing.